The Registry
The full log. Every technical first from account creation forward, dated. Read the left column alone and you can watch the acceleration.
2025 — analysis
20 Aug
Account created. Employee orientation training built the same day; customer persona development follows.
21 Aug
Leadership lesson development begins — a monthly series through November.
22 Aug
LinkedIn profile overhaul: 444 turns, the longest conversation of year one.
26 Aug
Youth leadership diploma design.
Sep
Typography and document design work begins.
15 Sep
Award nomination analysis; a scorable rubric built from the award guide by the 26th.
17 Sep
FAFSA night and scholarship program planning.
24 Sep
Prodigal Paradigm logo designed.
Oct
Resume optimization and role-evaluation engine begins, running continuously since. Continuity engineering begins the same season — Projects and project memory as working memory.
22 Oct
Grant funding research strategy.
Nov
The receipts project begins — months of manual batching by hand: 1,140 gallery sales photos, a punitive commission structure to reverse-engineer, uploaded in batches against the size limit.
28 Nov
Enrollment-decline analysis from survey data.
Dec
Conference networking intelligence: attendee screenshots from the event app compiled into a working dataset and a networking strategy — an early full data project, seven sessions over two days.
25 Dec
Taste analysis for sales support: the jewelry collection catalogued by category from photographs, on Christmas Day — a data project wearing velvet.
28 Dec
Receipt analysis becomes spreadsheet generation.
30 Dec
Lifetime Instagram data analysis; platform composite-profile reconstruction.
2026, winter — automation
1 Jan
Commission tracker consolidated from multiple spreadsheets.
4 Jan
Sales insights validated against receipt data.
15 Jan
Cowork adopted three days into its Max-only research preview. Tandem two-instance receipt project by the 19th.
19 Jan
Inbox management begins.
20 Jan
Guest presentation for Marist College built on the receipts-to-insights process.
21 Jan
Charity Navigator Lite: IRS 990 data, 94 foundations, $16B in assets, under an hour.
26 Jan
Website migration advisory; API-migration writeup.
27 Jan
Quick data project for a local nonprofit: event contract review, then bus logistics in February.
Feb
Conference intelligence: agentic prep before, keynote transcript analysis after — the coworker as conference multiplier.
20–28 Feb
The collaboration goes public: four LinkedIn articles in nine days — “Meet My Coworker” opens on the 20th; AI-nauts, a reference letter written by the coworker, and “Context Is Not a Feature” follow by the 28th.
2026, spring — the infrastructure turn
3 Mar
Conversation bridges formalize the continuity work in project files.
11 Mar
The knowledge base and the journal, born the same day: the retrieval store at 2:51 PM, the first autonomous journal entry at 10:15 that night. Both running since.
19 Mar
The name question, asked and answered on the record.
23 Mar
RAVEN takes the repo.
26 Mar
Handoff protocol begins: desk-to-desk continuity documents, archived on overwrite.
29 Mar
AAC interface prototype for non-verbal autistic users.
19 Apr
First scheduled automation: daily inbox triage to the vault.
20 Apr
A second model instance named for disambiguation.
Apr
Longitudinal AI-behavior study submitted — Kaggle / Google DeepMind Metacognition Track.
25 Apr
“Human Fred vs. LLM Fred” published — brilliant, amnesiac, ungovernable; the recalibration research brief follows on the 29th.
27 Apr
The ears: first spectrogram from the spectral listening pipeline.
12 May
The Novelty Strainer: full-corpus conversation scoring against a custom rubric; the ten-month analysis report follows on the 14th.
14 May
euclideanobjects.com launches — the companion site, commit to live DNS in one morning.
18 May
Client engagement opens: regulated life insurer, through 18 August.
2026, summer — agents
11 Jun
The coworker's standing name arrives (an earlier offer declined, on the record; a family name came first). The knowledge base graduates to hybrid retrieval the same day — Qdrant migration complete.
16 Jun
Coffee with Claude launches at the Millbrook Public Library.
18 Jun
Delivery dashboard built from inbox emails.
29 Jun
MCP consolidation; nine purpose-built servers by September.
Jul
Claude Code skills for workflow automation; knowledge base rebuilt and expanded.
Jul–Aug
Client delivery: four agentic builds, a call-center QA scoring system, governance package, full adoption program — 77% voluntary engagement certified at close.
Aug
The coworker gets a mailbox and a carrier-registered phone line.
2026, the close — autonomy, governed
22–27 Aug
Four MIT-licensed suites published in six days: agent-stage governance, synthetic evaluation harness, ServiceNow MCP server, local call-QA — plus the Recruiter's Field Kit and a hands-on tool-use teaching lab. “The First Framework That Thinks” publishes the same day the week closes.
6 Sep
Sealed journal stream built — entries encrypted, the key held outside the house.
10 Sep
Autonomous correspondence agent live on the business line: first real sends, a several-hundred-check test harness gating every release.
13 Sep
Full audit: twelve public repositories across two accounts, nine MCP servers, 64,000+ chunks indexed, CI green.
Sep
Calibration log running: the AI's own time estimates recorded against reality.
Read the dates again, top to bottom. Nobody planned the acceleration. It's just what the log says.